How to Track Grant Deadlines in Google Sheets: LOIs, Proposals and Report Due Dates, With an Owner per Deadline and Email Reminders (2026)
A single grant is rarely a single deadline. There is the letter of inquiry, then the full proposal if the funder invites one, then, once it is awarded, interim reports, a final report and the date the money has to be spent by. Each one usually belongs to a different person: the development director writes the proposal, the program manager writes the narrative report, the finance lead does the budget report. A list of grants with one due date each hides most of that. This guide builds a grant deadline tracker in Google Sheets around one row per deadline, each with its own owner and stage, rolled back up so every grant shows its next deadline, with a 30-day list per person and a free Apps Script that emails each owner before their deadlines and tells the grant lead when one is missed. The script runs in preview mode first, so nothing goes out until you have read it.
If your dates are things that expire and get renewed (staff licenses, insurance certificates, contracts), the license and certification tracker or the contract renewal alerts guide fits better. For general to-do lists with an owner and a due date, see overdue tasks with reminders, and for the simplest possible “email me before this date” setup, email reminders from a date column.
Step 1: a Grants tab with one row per grant
Name a tab Grants and type these headers in row 1. H to J are formulas (Step 4).
| Col | Header | What goes in it |
|---|---|---|
| A | Grant | A short name you’ll use exactly the same on the Deadlines tab: “After-School Arts”, “Youth Literacy 2027”. If you apply to the same funder every year, put the year in the name. |
| B | Funder | The foundation, agency or company |
| C | Amount | Requested or awarded |
| D | Grant status | A Data › Data validation dropdown: Prospect, Applying, Awarded, Declined, Closed. Declined and Closed switch off the grant’s remaining deadlines. |
| E, F | Award start, Award end | The award period from the agreement, once awarded |
| G | Lead | The email of the person responsible for the whole grant. They hear about missed deadlines. |
Step 2: a Deadlines tab with one row per deadline
Make a second tab named Deadlines. Every date a funder gives you gets its own row: the LOI, the full proposal, each interim report, the final report, the end of the award period, a site visit form. The script finds its columns by header, so you can add your own (Portal link, Notes) anywhere.
| Col | Header | What goes in it |
|---|---|---|
| A | Grant | Must match the Grants tab. Make it a dropdown with Data › Data validation › Dropdown (from a range) and the range Grants!A2:A. |
| B | Deadline | What is due: LOI, Full proposal, Interim report, Final report, Award end (spend-down)… |
| C | Due | The date from the funder’s guidelines or award agreement (Format › Number › Date) |
| D | Owner | The email of the person who has to get it in. Two people? Separate the addresses with commas. Blank means the reminders come to you. |
| E | Stage | A dropdown: Not started, Drafting, In review, Submitted, Waived. Waived is for a deadline that no longer applies (the funder didn’t invite a full proposal, or dropped a report). |
| F | Remind days | Optional: when to send reminders, as days before the due date, such as 30, 7, 1 for a big proposal. Blank means 14 and 3. |
| G, H | Days left, Status | Formulas (Step 3) |
| I | Submitted on | The date it went in. The script’s menu fills it in. |
| J | Sent log | Left empty for the script |
Report dates that the agreement defines relative to the award period can be worked out instead of typed. If an agreement says the final report is due 30 days after the award period ends, put this in that row’s Due cell (row 6 in the example below), using XLOOKUP to find the grant’s Award end:
=XLOOKUP(A6, Grants!$A$2:$A, Grants!$F$2:$F, "")+30
For a funder that gives 60 days, the same formula ends in +60 (row 9 in the example: =XLOOKUP(A9, Grants!$A$2:$A, Grants!$F$2:$F, "")+60). The date then follows the Grants tab if the award period changes. Use the exact wording of your agreement: if it gives a fixed date, type the date.
Step 3: days left and status
On the Deadlines tab, put these in G2 and H2 and fill them down. Days left is negative once the date has passed:
=IF(OR(A2="", C2=""), "", C2-TODAY())
Status is Done when the Stage is Submitted or Waived, Inactive when the grant was declined or closed, and otherwise Overdue, Due soon (14 days or less) or Upcoming:
=IF(G2="", "", IF(REGEXMATCH(LOWER(E2), "^(submitted|waived)$"), "Done", IF(REGEXMATCH(LOWER(XLOOKUP(A2, Grants!$A$2:$A, Grants!$D$2:$D, "")), "^(declined|closed)$"), "Inactive", IF(G2<0, "Overdue", IF(G2<=14, "Due soon", "Upcoming")))))
With the grants in Step 4, on November 22, 2026, the Deadlines tab reads:
| A Grant | B Deadline | C Due | D Owner | E Stage | F Remind days | G Days left | H Status | I Submitted on |
|---|---|---|---|---|---|---|---|---|
| Youth Literacy 2027 | LOI | Oct 15, 2026 | dana@example.org | Submitted | -38 | Done | Oct 13, 2026 | |
| Youth Literacy 2027 | Full proposal | Dec 4, 2026 | dana@example.org | Drafting | 30, 7, 1 | 12 | Due soon | |
| Food Pantry Expansion | Interim report | Jul 31, 2026 | priya@example.org | Submitted | -114 | Done | Jul 29, 2026 | |
| Food Pantry Expansion | Award end (spend-down) | Dec 31, 2026 | sam@example.org | Not started | 39 | Upcoming | ||
| Food Pantry Expansion | Final report | Jan 30, 2027 | priya@example.org | Not started | 69 | Upcoming | ||
| After-School Arts | Interim report | Nov 20, 2026 | priya@example.org | In review | -2 | Overdue | ||
| After-School Arts | Mid-year check-in form | Nov 25, 2026 | dana@example.org | Not started | 3 | Due soon | ||
| After-School Arts | Final report | Aug 29, 2027 | priya@example.org | Not started | 280 | Upcoming | ||
| Roof Replacement | LOI | Dec 15, 2026 | sam@example.org | Not started | 30, 7 | 23 | Upcoming | |
| Senior Meals 2027 | Budget clarifications | Nov 24, 2026 | sam@example.org | Not started | 2 | Inactive |
Example data: the grants and funders are made up. Days left and Status change every day because they use TODAY(). Sent log (J) is left out.
The After-School Arts interim report was due November 20 and is still in review, so it is Overdue. The check-in form for the same grant is due in 3 days and hasn’t been started, which is the row to worry about most. The Senior Meals grant was declined, so its budget clarifications are Inactive rather than Due soon. The Food Pantry final report (January 30, 2027) is 30 days after its award end, and the After-School Arts final report (August 29, 2027) is 60 days after its award end, both from the formula above.
Step 4: each grant’s next deadline
Back on the Grants tab, these three formulas go in H2, I2 and J2. Next deadline is the earliest open deadline for the grant, overdue ones included, found with FILTER and SMALL (format H as a date):
=IF(A2="", "", IFERROR(SMALL(FILTER(Deadlines!$C$2:$C, Deadlines!$A$2:$A=A2, REGEXMATCH(Deadlines!$H$2:$H, "^(Overdue|Due soon|Upcoming)$")), 1), ""))
Next deadline is says which one it is:
=IF(H2="", "", INDEX(FILTER(Deadlines!$B$2:$B, Deadlines!$A$2:$A=A2, Deadlines!$C$2:$C=H2, REGEXMATCH(Deadlines!$H$2:$H, "^(Overdue|Due soon|Upcoming)$")), 1))
Overdue counts the grant’s overdue deadlines with COUNTIFS:
=IF(A2="", "", COUNTIFS(Deadlines!$A$2:$A, A2, Deadlines!$H$2:$H, "Overdue"))
| A Grant | B Funder | C Amount | D Grant status | E Award start | F Award end | G Lead | H Next deadline | I Next deadline is | J Overdue |
|---|---|---|---|---|---|---|---|---|---|
| Youth Literacy 2027 | Riverbend Community Foundation | 25,000 | Applying | dana@example.org | Dec 4, 2026 | Full proposal | 0 | ||
| Food Pantry Expansion | Harlow Family Fund | 40,000 | Awarded | Jan 1, 2026 | Dec 31, 2026 | sam@example.org | Dec 31, 2026 | Award end (spend-down) | 0 |
| After-School Arts | Lakeside Arts Council | 12,000 | Awarded | Jul 1, 2026 | Jun 30, 2027 | dana@example.org | Nov 20, 2026 | Interim report | 1 |
| Roof Replacement | Northfield Trust | 75,000 | Prospect | sam@example.org | Dec 15, 2026 | LOI | 0 | ||
| Senior Meals 2027 | County Aging Fund | 18,000 | Declined | sam@example.org | 0 |
The Grants tab for the example on November 22, 2026.
Sort a copy of this view by Next deadline and you have the board-meeting answer to “what’s coming up on each grant?” without opening the Deadlines tab.
Step 5: the next 30 days, per person
On a third tab (call it Summary), this lists every open deadline due in the next 30 days or already overdue, soonest first:
=SORT(FILTER({Deadlines!A2:A, Deadlines!B2:B, Deadlines!C2:C, Deadlines!D2:D, Deadlines!E2:E, Deadlines!H2:H}, Deadlines!C2:C<=TODAY()+30, REGEXMATCH(Deadlines!H2:H, "^(Overdue|Due soon|Upcoming)$")), 3, TRUE)
| A Grant | B Deadline | C Due | D Owner | E Stage | F Status |
|---|---|---|---|---|---|
| After-School Arts | Interim report | Nov 20, 2026 | priya@example.org | In review | Overdue |
| After-School Arts | Mid-year check-in form | Nov 25, 2026 | dana@example.org | Not started | Due soon |
| Youth Literacy 2027 | Full proposal | Dec 4, 2026 | dana@example.org | Drafting | Due soon |
| Roof Replacement | LOI | Dec 15, 2026 | sam@example.org | Not started | Upcoming |
Result on November 22, 2026. The award end on December 31 (39 days) and the declined grant’s row are left out.
For a per-person view, put the list of owners in A2 of another part of the Summary tab and the three counts next to it in B2, C2 and D2, filled down:
=SORT(UNIQUE(FILTER(Deadlines!D2:D, Deadlines!D2:D<>"")))
=COUNTIFS(Deadlines!$D$2:$D, A2, Deadlines!$H$2:$H, "Overdue")
=COUNTIFS(Deadlines!$D$2:$D, A2, Deadlines!$C$2:$C, "<="&(TODAY()+30), Deadlines!$H$2:$H, "<>Done", Deadlines!$H$2:$H, "<>Inactive")
=COUNTIFS(Deadlines!$D$2:$D, A2, Deadlines!$E$2:$E, "Not started", Deadlines!$H$2:$H, "Due soon")
| A Owner | B Overdue | C Open in next 30 days | D Not started, due soon |
|---|---|---|---|
| dana@example.org | 0 | 2 | 1 |
| priya@example.org | 1 | 1 | 0 |
| sam@example.org | 0 | 1 | 0 |
Owner workload in the example on November 22, 2026.
Then select A2:J on the Deadlines tab, open Format › Conditional formatting, choose Custom formula is and add these rules (they never overlap, so their order doesn’t matter):
| Custom formula | Color | Meaning |
|---|---|---|
=$H2="Overdue" | Red | Past the due date and not submitted |
=AND($H2="Due soon", $E2="Not started") | Amber | Due within 14 days and not started |
=AND($H2="Due soon", $E2<>"Not started") | Yellow | Due within 14 days, work under way |
=OR($H2="Done", $H2="Inactive") | Grey text | Submitted, waived, or the grant was declined or closed |
Step 6: email each owner, and tell the lead about missed deadlines
Colors only help when someone opens the sheet. Open Extensions › Apps Script, paste the script below and save. Then:
- Reload the spreadsheet. A Grants menu appears (it is created by the script’s
onOpen, as described in Google’s custom menus page). - Run
sendGrantRemindersonce from the editor and approve the permissions.PREVIEWis true, so every email comes to you, with the real recipient in the subject, and nothing is written to the sheet. - Read the previews. When they look right, set
PREVIEW = falseand save. - Add the trigger: Triggers › Add trigger › sendGrantReminders › Time-driven › Day timer, for example 7 to 8 AM. See Google’s installable triggers page for the details.
/**
* Grant deadline reminders from a "Deadlines" tab, plus a "mark submitted" menu.
*
* Tab "Grants" (row 1 = headers): Grant, Grant status, Lead (others are fine)
* Tab "Deadlines" (row 1 = headers, any order, extra columns are fine):
* Required: Grant, Deadline, Due, Owner, Stage, Sent log
* Optional: Remind days, Submitted on
*
* One row per deadline (LOI, full proposal, interim report, final report...). Every run sends each
* person at most one email listing their deadlines:
* - when a deadline enters one of its Remind days windows (blank = DEFAULT_DAYS), e.g. "30, 7, 1"
* - on the due date, and every OVERDUE_EVERY days while it is overdue
* - overdue for ESCALATE_AFTER days or more: also listed in the grant Lead's email
* Rows whose Stage is Submitted or Waived, and grants whose status is Declined or Closed, are skipped.
* Run it with PREVIEW = true first: every email comes to you and nothing is logged.
*/
const SHEET_NAME = 'Deadlines';
const GRANTS_SHEET = 'Grants';
const DEFAULT_DAYS = '14, 3'; // reminder windows when Remind days is blank
const OVERDUE_EVERY = 3; // days between overdue emails
const ESCALATE_AFTER = 1; // days overdue before the grant lead is told too (0 = on the due date)
const PREVIEW = true; // true: everything goes to you, nothing is logged
const LOG_KEEP = 20; // entries kept in each Sent log cell
const DONE_STAGE = /^(submitted|waived)$/i;
const DONE_GRANT = /^(declined|closed)$/i;
function onOpen() {
SpreadsheetApp.getUi().createMenu('Grants')
.addItem('Mark selected deadline submitted', 'markDeadlineSubmitted')
.addItem('Send reminders now', 'sendGrantReminders')
.addToUi();
}
function sendGrantReminders(now) {
const lock = LockService.getDocumentLock();
if (!lock.tryLock(30000)) return; // another run is still going
try {
// A time-driven trigger passes an event object, so only use a real Date.
return remind_(now instanceof Date ? new Date(now) : new Date());
} finally {
lock.releaseLock();
}
}
function headers_(values) {
const head = values[0].map((h) => String(h).trim().toLowerCase());
return (n) => head.indexOf(n.toLowerCase());
}
function remind_(now) {
const ss = SpreadsheetApp.getActive();
const tz = ss.getSpreadsheetTimeZone();
const sh = ss.getSheetByName(SHEET_NAME);
if (!sh) throw new Error('No tab named "' + SHEET_NAME + '".');
const data = sh.getDataRange().getValues();
const col = headers_(data);
const missing = ['Grant', 'Deadline', 'Due', 'Owner', 'Stage', 'Sent log'].filter((n) => col(n) < 0);
if (missing.length) throw new Error('Missing column(s) on ' + SHEET_NAME + ': ' + missing.join(', '));
const C = { grant: col('Grant'), what: col('Deadline'), due: col('Due'), owner: col('Owner'),
stage: col('Stage'), days: col('Remind days'), log: col('Sent log') };
// Grant status and lead, by grant name (case-insensitive).
const grants = {};
const gs = ss.getSheetByName(GRANTS_SHEET);
if (gs) {
const g = gs.getDataRange().getValues(), gc = headers_(g);
const gn = gc('Grant'), gst = gc('Grant status'), gl = gc('Lead');
for (let r = 1; r < g.length && gn >= 0; r++) {
const name = String(g[r][gn]).trim().toLowerCase();
if (name) grants[name] = { status: gst >= 0 ? String(g[r][gst]).trim() : '', lead: gl >= 0 ? String(g[r][gl]).trim() : '' };
}
}
const me = Session.getEffectiveUser().getEmail();
const day = (d) => { const p = Utilities.formatDate(d, tz, 'yyyy-MM-dd').split('-');
return Date.UTC(+p[0], p[1] - 1, +p[2]) / 864e5; };
const today = day(now);
const people = {}, problems = [];
if (!gs) problems.push('no tab named "' + GRANTS_SHEET + '", so grant status and leads are not used');
const person = (to) => (people[to] = people[to] || { own: [], lead: [] });
for (let r = 1; r < data.length; r++) {
const row = data[r];
const grant = String(row[C.grant]).trim();
if (!grant) continue;
if (DONE_STAGE.test(String(row[C.stage]).trim())) continue;
const info = grants[grant.toLowerCase()];
if (info && DONE_GRANT.test(info.status)) continue;
const due = row[C.due];
if (!(due instanceof Date)) { problems.push((r + 1) + ' (Due is not a date)'); continue; }
const raw = C.days >= 0 && String(row[C.days]).trim() !== '' ? String(row[C.days]) : DEFAULT_DAYS;
const windows = raw.split(/[,;\s]+/).filter(String).map(Number);
if (!windows.length || windows.some((n) => !(n >= 0) || n % 1)) { problems.push((r + 1) + ' (Remind days should look like 30, 7, 1)'); continue; }
if (!info && gs) problems.push((r + 1) + ' (grant not found on ' + GRANTS_SHEET + ', so no lead to escalate to)');
const left = day(due) - today;
const iso = Utilities.formatDate(due, tz, 'yyyy-MM-dd');
const log = String(row[C.log]).split(';').map((s) => s.trim()).filter(String);
let tag = '', what = '';
if (left > 0) {
const w = windows.filter((n) => n >= left).sort((a, b) => a - b)[0]; // the tightest window reached
if (w !== undefined) { tag = 'd' + w; what = 'due in ' + left + ' day' + (left === 1 ? '' : 's'); }
} else if (left === 0) { tag = 'today'; what = 'due TODAY'; }
else { tag = 'late' + Math.floor((-left - 1) / OVERDUE_EVERY); what = 'OVERDUE by ' + (-left) + ' day' + (left === -1 ? '' : 's'); }
if (!tag || log.indexOf(iso + ' ' + tag) >= 0) continue;
const stage = String(row[C.stage]).trim() || 'Not started';
const owner = String(row[C.owner]).trim() || me;
const item = { r: r, grant: grant, what: String(row[C.what]).trim(), due: due, left: left, note: what,
stage: stage, owner: owner, entry: iso + ' ' + tag, log: log, written: false };
person(owner).own.push(item);
const lead = info ? info.lead : '';
if (left < 0 && -left >= ESCALATE_AFTER && lead && lead.toLowerCase() !== owner.toLowerCase()) person(lead).lead.push(item);
}
let sent = 0, items = 0, stopped = '';
const fmt = (d) => Utilities.formatDate(d, tz, 'EEE, MMM d');
const line = (x, who) => '- ' + x.grant + ': ' + x.what + ', due ' + fmt(x.due) + ' (' + x.note + '), stage: ' + x.stage +
(who ? ', owner: ' + x.owner : '') + (x.left <= 7 && /^not started$/i.test(x.stage) ? ' <- not started yet' : '');
for (const to of Object.keys(people)) {
const p = people[to];
p.own.sort((a, b) => a.left - b.left); p.lead.sort((a, b) => a.left - b.left);
const recipients = PREVIEW ? 1 : to.split(',').length;
if (MailApp.getRemainingDailyQuota() < recipients) { stopped = 'quota'; break; }
const all = p.own.concat(p.lead);
const late = all.filter((x) => x.left < 0).length;
const parts = [];
if (p.own.length) parts.push('Your grant deadlines:\n' + p.own.map((x) => line(x, false)).join('\n'));
if (p.lead.length) parts.push('Overdue on grants you lead:\n' + p.lead.map((x) => line(x, true)).join('\n'));
const subject = 'Grant deadlines: ' + all.length + ' need' + (all.length === 1 ? 's' : '') + ' attention' + (late ? ' (' + late + ' overdue)' : '');
MailApp.sendEmail({
to: PREVIEW ? me : to,
subject: (PREVIEW ? '[PREVIEW to ' + to + '] ' : '') + subject,
body: parts.join('\n\n') + '\n\nSubmitted one? Set its Stage to Submitted (or Grants > Mark selected deadline submitted) and the reminders stop.\n'
});
sent++; items += all.length;
if (!PREVIEW) all.forEach((x) => {
if (x.written) return;
x.written = true;
sh.getRange(x.r + 1, C.log + 1).setValue(x.log.concat([x.entry]).slice(-LOG_KEEP).join('; '));
});
}
if (problems.length || stopped) console.log('Check rows: ' + problems.join(', ') + (stopped ? ' | stopped: daily email quota reached' : ''));
return { sent: sent, items: items, problems: problems, stopped: stopped };
}
/** Grants > Mark selected deadline submitted: sets Stage to Submitted and fills Submitted on. */
function markDeadlineSubmitted() {
const ss = SpreadsheetApp.getActive();
const ui = SpreadsheetApp.getUi();
const sh = ss.getActiveSheet();
const r = sh.getActiveCell().getRow();
if (sh.getName() !== SHEET_NAME || r < 2) { ui.alert('Select a deadline on the ' + SHEET_NAME + ' tab first.'); return; }
const width = sh.getLastColumn();
const head = sh.getRange(1, 1, 1, width).getValues()[0].map((h) => String(h).trim().toLowerCase());
const row = sh.getRange(r, 1, 1, width).getValues()[0];
const g = head.indexOf('grant'), w = head.indexOf('deadline'), s = head.indexOf('stage'), on = head.indexOf('submitted on');
if (g < 0 || w < 0 || s < 0) { ui.alert('The ' + SHEET_NAME + ' tab needs Grant, Deadline and Stage columns.'); return; }
const name = String(row[g]).trim() + ': ' + String(row[w]).trim();
if (!String(row[g]).trim()) { ui.alert('Row ' + r + ' has no grant.'); return; }
if (DONE_STAGE.test(String(row[s]).trim())) { ui.alert(name + ' is already ' + String(row[s]).trim() + '.'); return; }
if (ui.alert('Mark submitted', name + ': set Stage to Submitted?', ui.ButtonSet.YES_NO) !== ui.Button.YES) return;
sh.getRange(r, s + 1).setValue('Submitted');
const now = new Date();
if (on >= 0) sh.getRange(r, on + 1).setValue(new Date(now.getFullYear(), now.getMonth(), now.getDate()));
ss.toast(name + ' marked submitted. Its reminders stop.', 'Grants', 5);
}
What it sends, with the defaults:
- Before the due date: one email when a deadline enters each of its Remind days windows (14 and 3 days if blank). If a day is missed, the next run still sends the reminder for the window you are in, once. On November 22 that is the Youth Literacy full proposal (12 days, inside its 30-day window), the check-in form (3 days, flagged “not started yet”) and the Roof Replacement LOI (23 days, inside its 30-day window).
- On the due date, and then every 3 days while it is overdue (
OVERDUE_EVERY). - Missed deadlines go to the lead too. Once a deadline is
ESCALATE_AFTERday overdue, it is also listed under “Overdue on grants you lead” in the grant lead’s email (the Lead column on the Grants tab), unless the lead is the owner. In the example, Priya gets the overdue interim report and Dana, the After-School Arts lead, sees it in her email as well. - One email per person per run, listing their deadlines soonest first. On November 22 that is three emails: Dana (two of her own plus the escalation), Priya and Sam.
- Done means done. Rows whose Stage is Submitted or Waived, and every deadline of a Declined or Closed grant, are skipped.
- Never twice. Each reminder is written to the row’s Sent log as the due date plus a tag (for example
2026-11-20 late0), so a second run the same day sends nothing. If a funder gives you an extension, change Due and the reminders start over for the new date. - Safe by default. A document lock stops two runs overlapping, the Apps Script email quota (100 recipients a day on a consumer Gmail account, 1,500 on Google Workspace) is checked before each email, and rows with no real Due date or an unreadable Remind days are skipped and listed in the script’s log (with
console.log) instead of guessed at.
Marking a deadline submitted: click any cell in the deadline’s row and choose Grants › Mark selected deadline submitted. After you confirm, it sets Stage to Submitted and Submitted on to today, and the reminders for that row stop.
A weekly grants check-in
- When a funder publishes a cycle or sends an award letter, add every date it gives you as its own row straight away, with an owner, even the ones months out. A final report is easy to forget a year later.
- Once a week, look at the amber rows (due soon, not started) and the per-person counts on the Summary tab. Those are the conversations to have this week.
- When something goes in, mark it submitted the same day, so nobody gets a reminder for work that is done.
- When a grant is declined or closed, change its Grant status on the Grants tab. Its remaining deadlines turn Inactive and stop reminding, and the history stays.
Pitfalls
- Grant names that don’t match. “After School Arts” on the Deadlines tab isn’t “After-School Arts” on the Grants tab, so the lead isn’t found and the grant’s Next deadline stays blank. The dropdown in Step 2 prevents it, the script reports rows whose grant it can’t find, and Data › Data cleanup › Trim whitespace fixes pasted names.
- Deadlines with a time of day. The sheet tracks dates. If a funder’s portal closes at a set time, or in another time zone, put that in a Notes column and set Remind days so the last reminder comes a day earlier than you need it.
- Reporting period vs due date. A report covering the period ending June 30 is not due on June 30. Due is the date the report has to be in.
- Dates typed as text. Days left needs a real date. Select column C and use Format › Number › Date: a real date changes format, text doesn’t.
- Remind days in the wrong form. Use whole numbers separated by commas, like
30, 7, 1. The script reports anything else instead of guessing. - Time zone. TODAY() and the script both use the spreadsheet’s time zone (File › Settings › Time zone), and the trigger fires in the Apps Script project’s time zone, so set both to where your team works.
- Sharing. Anyone with edit access sees every grant and amount, and triggers run as whoever created them, so emails come from that person’s account. Have the trigger created by a shared development or grants account if you have one.
FAQ
How do I track grant deadlines in Google Sheets?
Use two tabs. Grants has one row per grant (funder, amount, grant status, award dates, lead). Deadlines has one row per deadline, so a grant with an LOI, a full proposal, an interim report and a final report has four rows, each with its own due date, owner and stage. Days left is =IF(OR(A2="", C2=""), "", C2-TODAY()) and a Status formula turns that into Done, Inactive, Overdue, Due soon or Upcoming.
Why one row per deadline instead of one row per grant?
Because a grant’s deadlines have different dates, different people and different stages. With one row per grant you end up with columns like LOI due, Proposal due, Report 1 due and Report 2 due, and nothing can be sorted, filtered or reminded about in one place. One row per deadline gives every deadline its own owner, stage and reminders, and the Grants tab can still show each grant’s next deadline with SMALL and FILTER.
How do I see each grant’s next deadline?
On the Grants tab, =IF(A2="", "", IFERROR(SMALL(FILTER(Deadlines!$C$2:$C, Deadlines!$A$2:$A=A2, REGEXMATCH(Deadlines!$H$2:$H, "^(Overdue|Due soon|Upcoming)$")), 1), "")) returns the earliest due date that is still open for that grant, including one that is already overdue. Format the cell as a date. A second FILTER with INDEX returns which deadline it is.
How do I calculate a report due date from the award end date?
If the award agreement says the final report is due a set number of days after the award period ends, look up the end date and add the days, for example =XLOOKUP(A6, Grants!$A$2:$A, Grants!$F$2:$F, "")+30. Use the exact wording of your agreement: some funders count from the end of the reporting period, some give a fixed date.
Can Google Sheets email me before a grant deadline?
Not by itself: conditional formatting only colors cells. A short Apps Script on a daily time-driven trigger can, and the one on this page sends each owner one email listing their deadlines when each enters a reminder window (14 and 3 days before by default, or your own such as 30, 7, 1), on the due date and every 3 days while overdue, and adds overdue deadlines to the grant lead’s email. An add-on such as SheetReminders sends date reminders without code.
What happens to the reminders if a funder gives us an extension?
Change the Due date on that row. The script’s Sent log records each reminder as the due date plus a tag, so the old date’s reminders no longer match and the reminders start over for the new date. Note the extension in a Notes column so you know why the date changed.
See SheetReminders
Short on time? Watch the 50-second version
Related Google Sheets guides
- How to generate a PDF or Google Doc for each row in Google Sheets
- Find and remove duplicates in Google Sheets
- Compare two columns or two sheets for duplicates
- Find case-insensitive and fuzzy duplicates in Google Sheets
- Best Autocrat alternatives for mail merge to PDF and Docs
- Make invoices or certificates from Google Sheets rows
- Create sales quotes or estimates from Google Sheets
- Generate receipts from Google Sheets rows
- Create purchase orders from Google Sheets
- Make packing slips from Google Sheets orders
- Generate a PDF certificate from a Google Form response
- Issue numbered training completion certificates with expiry dates
- Make a PDF progress report for each student
- Generate offer letters from a Google Sheets hiring tracker
- Generate contracts and agreements from a Google Docs template
- Make work orders for service jobs from Google Sheets
- Email each row’s PDF as an attachment
- Automatic email reminders from a date column
- Contract renewal and expiration alerts from Google Sheets
- Track certificate of insurance (COI) expirations in Google Sheets
- Track employee license and certification expirations
- Track equipment and vehicle maintenance with reminders
- Equipment sign-out sheet with due-back and overdue reminders
- Track warranty expiration dates with reminders
- Birthday and work anniversary reminders from Google Sheets
- Rent due and lease renewal reminders from Google Sheets
- Send invoice payment reminders from Google Sheets
- Highlight overdue tasks and send email reminders
- Follow-up reminders for leads, clients and candidates
- Membership renewal reminders for clubs and associations
- Appointment reminder emails for clients
- Probation and performance review reminders for managers
- Inventory expiration dates with email alerts
- Domain and SSL certificate renewal reminders
- Name badges and place cards from a guest list
- Vehicle registration, inspection and insurance reminders
- Event sign-in sheets and table seating lists
- Pet vaccination expiry reminders for owners
- Customer account statements with aging
- Subscription tracker with renewal and free-trial reminders
- Mailing labels: one per household, clean addresses
- Volunteer shifts: open slots, reminders and rosters
- Year-end donor giving statements, one PDF per donor
- Volunteer hours verification letters, one PDF per request
- Instrument calibration due dates with email reminders
- Pay stubs from a payroll sheet, one PDF per employee
- Gift certificates with codes, balances and a redemption log
- Bill due dates: mark paid, 30-day totals and reminders
- Passport expiry: trips, the 6-month rule and renewal reminders
- Class rosters: one PDF per class, A–Z, with seat counts
- Insurance renewals: premium changes and reminders
- Onboarding checklists: tasks from start dates, owner reminders
- Raffle tickets: numbered stubs, seller books, sales tracker
- SheetWeave vs Autocrat
- SheetWeave vs Document Studio
- SheetWeave vs RowDocs
Instructions refer to Google Sheets and Apps Script as they worked on November 22, 2026. Not legal or financial advice, and not affiliated with Google or any funder. Google Sheets is a trademark of Google LLC. Deadlines, reporting requirements and what counts as on time are set by each funder’s guidelines and award agreement; check them. Questions or corrections: hello@loomwise.app.