Employee Onboarding Checklist in Google Sheets: Tasks Due from Each New Hire’s Start Date and Email Reminders to Task Owners (2026)

Onboarding goes wrong in small, predictable ways: the laptop is ordered the day the new hire arrives, the payroll forms are chased in week two, the 30-day check-in never happens because nobody owned it. Most of these tasks have the same shape for every hire, an owner and a number of days before or after the first day, which makes them a good fit for a spreadsheet. This guide builds an onboarding checklist in Google Sheets for a small team: the tasks written once as a template, a checklist for each new hire with due dates counted from their start date, a Done checkbox, a list of what is due now, progress per hire, and a free Apps Script that adds a hire’s checklist from a menu and emails IT, HR and the hiring manager before their tasks are due. The script runs in preview mode first, so nothing goes out until you have read it.

For review dates counted from a hire date (end of probation, annual reviews), see performance review reminders. For one-off tasks with fixed due dates, overdue task highlighting and reminders fits better, and for the simplest possible “email me before this date” setup, see email reminders from a date column. To send the offer letter itself, see offer letters from a sheet.

Step 1: a Hires tab

Name a tab Hires with these headers in row 1: Name, Role, Start date and Manager email, one row per new hire. Format Start date with Format › Number › Date. Names have to be unique here, because the checklist looks the start date up by name; if two people share a name, add an initial.

A
Name
B
Role
C
Start date
D
Manager email
Priya ShahAccount managerDec 1, 2026dana@example.com
Marcus LeeWarehouse leadNov 16, 2026sam@example.com
Elena RuizDesignerDec 14, 2026dana@example.com

Step 2: the task template, written once

On a tab named Template, list the tasks every new hire needs, with Task, Owner and Days from start in row 1. Owner is an email address (a shared one like it@ works well) or the word Manager for tasks the hiring manager does. Days from start counts calendar days from the first day: -7 is a week before, 0 is the first day, 30 is a month in.

A
Task
B
Owner
C
Days from start
Order laptop and set up accountsit@example.com-7
Collect payroll and tax formshr@example.com-5
First-day welcome and team lunchManager0
Benefits enrollment walkthroughhr@example.com5
One-week check-inManager7
30-day check-inManager30

Example data: the people, addresses and tasks are made up. Which forms and checks a new hire needs depends on your country, state and company, so build the template from your own process.

Step 3: a checklist for each hire, with due dates from the start date

On a tab named Checklist, put exactly these headers in A1 to J1: Hire, Task, Owner, Days from start, Done, Due, Days left, Status, Send to, Sent log. Every hire gets one row per template task. A to D are copied from the template, E is a checkbox (Insert › Checkbox), F to I are formulas and J is left for the script. The script in Step 4 adds a hire’s rows, checkboxes and formulas in one click, so you rarely type these yourself.

Why copies and not one formula that lists every hire times every task? A spilled formula rebuilds its rows whenever a hire is added or the list is sorted, but a ticked checkbox is a plain value that stays put, so the ticks would end up next to the wrong tasks. Fixed rows keep every tick with its task.

Due looks up the hire’s start date with XLOOKUP, adds the days and uses WORKDAY to move a Saturday or Sunday to the Friday before: WORKDAY with -1 returns the last working day before the date it is given, so giving it the day after keeps a weekday as it is. LET names the start date so it is looked up once. Format F as a date:

=IF(OR(A2="", D2=""), "", LET(s, XLOOKUP(A2, Hires!$A$2:$A, Hires!$C$2:$C, ""), IF(s="", "", WORKDAY(s+D2+1, -1))))

Days left is negative once the due date has passed:

=IF(F2="", "", F2-TODAY())

Status is Done when the box is ticked, then Overdue, Due today, Due soon (3 days or less) or Upcoming:

=IF(F2="", "", IF(E2=TRUE, "Done", IF(G2<0, "Overdue", IF(G2=0, "Due today", IF(G2<=3, "Due soon", "Upcoming")))))

Send to turns the word Manager into the hire’s manager from the Hires tab and keeps any other owner as it is:

=IF(A2="", "", IF(C2="Manager", XLOOKUP(A2, Hires!$A$2:$A, Hires!$D$2:$D, ""), C2))

On Monday, November 23, 2026, the example checklist reads:

A
Hire
B
Task
C
Owner
D
Days from start
E
Done
F
Due
G
Days left
H
Status
I
Send to
Priya ShahOrder laptop and set up accountsit@example.com-7☐Nov 24, 20261Due soonit@example.com
Priya ShahCollect payroll and tax formshr@example.com-5☐Nov 26, 20263Due soonhr@example.com
Priya ShahFirst-day welcome and team lunchManager0☐Dec 1, 20268Upcomingdana@example.com
Priya ShahBenefits enrollment walkthroughhr@example.com5☐Dec 4, 202611Upcominghr@example.com
Priya ShahOne-week check-inManager7☐Dec 8, 202615Upcomingdana@example.com
Priya Shah30-day check-inManager30☐Dec 31, 202638Upcomingdana@example.com
Marcus LeeOrder laptop and set up accountsit@example.com-7☑Nov 9, 2026-14Doneit@example.com
Marcus LeeCollect payroll and tax formshr@example.com-5☑Nov 11, 2026-12Donehr@example.com
Marcus LeeFirst-day welcome and team lunchManager0☑Nov 16, 2026-7Donesam@example.com
Marcus LeeBenefits enrollment walkthroughhr@example.com5☐Nov 20, 2026-3Overduehr@example.com
Marcus LeeOne-week check-inManager7☐Nov 23, 20260Due todaysam@example.com
Marcus Lee30-day check-inManager30☐Dec 16, 202623Upcomingsam@example.com
Elena RuizOrder laptop and set up accountsit@example.com-7☑Dec 7, 202614Doneit@example.com
Elena RuizCollect payroll and tax formshr@example.com-5☐Dec 9, 202616Upcominghr@example.com
Elena RuizFirst-day welcome and team lunchManager0☐Dec 14, 202621Upcomingdana@example.com
Elena RuizBenefits enrollment walkthroughhr@example.com5☐Dec 18, 202625Upcominghr@example.com
Elena RuizOne-week check-inManager7☐Dec 21, 202628Upcomingdana@example.com
Elena Ruiz30-day check-inManager30☐Jan 13, 202751Upcomingdana@example.com

Days left and Status change every day because they use TODAY(). Sent log (J) is left out.

Marcus started on November 16. His first three tasks are ticked, but the benefits walkthrough (5 days after his start, which fell on Saturday, November 21, so it moved to Friday, November 20) is 3 days overdue, and his manager’s one-week check-in is due today. Priya starts on December 1, so IT has a day left to get her laptop ready and HR 3 days to collect her forms. Elena starts on December 14 and IT has already ticked her laptop, two weeks early, which is fine: Done wins over the date.

Step 4: the script: add a checklist from a menu, email owners before tasks are due

Open Extensions › Apps Script, paste the script below and save. Then:

  1. Reload the spreadsheet. An Onboarding menu appears (it is created by the script’s onOpen, as described in Google’s custom menus page).
  2. To add a hire, type them on the Hires tab, click any cell in their row and choose Onboarding › Add checklist for selected hire. The script copies every template task under the last checklist row, inserts the checkboxes and writes the four formulas for each row (the same formulas as above with that row’s number). It refuses a hire who already has a checklist or has no real start date.
  3. Run sendOnboardingReminders once from the editor and approve the permissions. PREVIEW is true, so every email comes to you, with the real recipient in the subject, and nothing is written to the sheet.
  4. Read the previews. When they look right, set PREVIEW = false and save.
  5. Add the trigger: Triggers › Add trigger › sendOnboardingReminders › Time-driven › Day timer, for example 7 to 8 AM. See Google’s installable triggers page for the details.
/**
 * Employee onboarding checklist: build each new hire's task list from a template, then email task owners.
 *
 * Tab "Hires" (row 1 = headers): Name, Start date, Manager email (other columns are fine)
 * Tab "Template": Task, Owner (an email address, or the word Manager), Days from start (-7 = a week before)
 * Tab "Checklist": A Hire, B Task, C Owner, D Days from start, E Done, F Due, G Days left, H Status, I Send to, J Sent log
 *
 * Onboarding > Add checklist for selected hire copies the template into Checklist for the hire you clicked.
 * sendOnboardingReminders (daily trigger) sends each owner at most one email per run listing open tasks
 * that are due in WINDOWS days or less, due today, or overdue (then every OVERDUE_EVERY days).
 * Due dates that land on a Saturday or Sunday move back to the Friday. Run it with PREVIEW = true first.
 */
const HIRES         = 'Hires';
const TEMPLATE      = 'Template';
const CHECKLIST     = 'Checklist';
const WINDOWS       = [3, 0];  // days before the due date
const OVERDUE_EVERY = 3;       // days between emails about an overdue task
const PREVIEW       = true;    // true: everything goes to you, nothing is logged
const LOG_KEEP      = 10;      // entries kept in each Sent log cell
const LAYOUT        = ['Hire', 'Task', 'Owner', 'Days from start', 'Done', 'Due', 'Days left', 'Status', 'Send to', 'Sent log'];
const MONTHS        = ['Jan', 'Feb', 'Mar', 'Apr', 'May', 'Jun', 'Jul', 'Aug', 'Sep', 'Oct', 'Nov', 'Dec'];

function onOpen() {
  SpreadsheetApp.getUi().createMenu('Onboarding')
    .addItem('Add checklist for selected hire', 'addChecklistForHire')
    .addItem('Send reminders now', 'sendOnboardingReminders')
    .addToUi();
}

// The formulas for columns F to I of one Checklist row (the same ones the guide shows for row 2).
function rowFormulas_(r) {
  return [
    '=IF(OR(A' + r + '="", D' + r + '=""), "", LET(s, XLOOKUP(A' + r + ', Hires!$A$2:$A, Hires!$C$2:$C, ""), IF(s="", "", WORKDAY(s+D' + r + '+1, -1))))',
    '=IF(F' + r + '="", "", F' + r + '-TODAY())',
    '=IF(F' + r + '="", "", IF(E' + r + '=TRUE, "Done", IF(G' + r + '<0, "Overdue", IF(G' + r + '=0, "Due today", IF(G' + r + '<=3, "Due soon", "Upcoming")))))',
    '=IF(A' + r + '="", "", IF(C' + r + '="Manager", XLOOKUP(A' + r + ', Hires!$A$2:$A, Hires!$D$2:$D, ""), C' + r + '))'
  ];
}

function headers_(head, names) {
  const h = head.map((x) => String(x).trim().toLowerCase());
  const out = {};
  names.forEach((n) => { out[n] = h.indexOf(n.toLowerCase()); });
  return out;
}

function tab_(ss, name) {
  const sh = ss.getSheetByName(name);
  if (!sh) throw new Error('No tab named "' + name + '".');
  return sh;
}

/** Onboarding > Add checklist for selected hire */
function addChecklistForHire() {
  const ss = SpreadsheetApp.getActive();
  const ui = SpreadsheetApp.getUi();
  const sh = ss.getActiveSheet();
  const r = sh.getActiveCell().getRow();
  if (sh.getName() !== HIRES || r < 2) { ui.alert('Click a hire on the ' + HIRES + ' tab first.'); return; }
  const hires = sh.getDataRange().getValues();
  const H = headers_(hires[0], ['Name', 'Start date']);
  if (H['Name'] < 0 || H['Start date'] < 0) { ui.alert('The ' + HIRES + ' tab needs Name and Start date columns.'); return; }
  const name = String((hires[r - 1] || [])[H['Name']] || '').trim();
  if (!name) { ui.alert('Row ' + r + ' has no name.'); return; }
  if (!((hires[r - 1] || [])[H['Start date']] instanceof Date)) { ui.alert(name + ' needs a real Start date first.'); return; }

  const tpl = tab_(ss, TEMPLATE).getDataRange().getValues();
  const T = headers_(tpl[0], ['Task', 'Owner', 'Days from start']);
  if (T['Task'] < 0 || T['Owner'] < 0 || T['Days from start'] < 0) { ui.alert('The ' + TEMPLATE + ' tab needs Task, Owner and Days from start columns.'); return; }
  const tasks = [];
  for (let i = 1; i < tpl.length; i++) {
    const task = String(tpl[i][T['Task']]).trim();
    if (!task) continue;
    const owner = String(tpl[i][T['Owner']]).trim(), days = String(tpl[i][T['Days from start']]).trim();
    if (!owner || days === '' || Number(days) % 1 !== 0) { ui.alert(TEMPLATE + ' row ' + (i + 1) + ' needs an Owner and a whole number of Days from start.'); return; }
    tasks.push([name, task, owner, Number(days), false]);
  }
  if (!tasks.length) { ui.alert('The ' + TEMPLATE + ' tab has no tasks.'); return; }

  const ck = tab_(ss, CHECKLIST);
  const data = ck.getDataRange().getValues();
  if (data[0].slice(0, LAYOUT.length).map((x) => String(x).trim()).join('|') !== LAYOUT.join('|')) {
    ui.alert('Row 1 of ' + CHECKLIST + ' should be: ' + LAYOUT.join(', ')); return;
  }
  let last = 1;
  for (let i = 1; i < data.length; i++) {
    if (String(data[i][0]).trim() === '') continue;
    last = i + 1;
    if (String(data[i][0]).trim().toLowerCase() === name.toLowerCase()) { ui.alert(name + ' already has a checklist (row ' + (i + 1) + ').'); return; }
  }
  const start = last + 1;
  ck.getRange(start, 1, tasks.length, 5).setValues(tasks);
  ck.getRange(start, 5, tasks.length, 1).insertCheckboxes();
  ck.getRange(start, 6, tasks.length, 4).setFormulas(tasks.map((_, i) => rowFormulas_(start + i)));
  ss.toast(tasks.length + ' tasks added for ' + name + ' (rows ' + start + ' to ' + (start + tasks.length - 1) + ').', 'Onboarding', 5);
}

function sendOnboardingReminders(now) {
  const lock = LockService.getDocumentLock();
  if (!lock.tryLock(30000)) return;  // another run is still going
  try {
    // A time-driven trigger passes an event object, so only use a real Date.
    return remind_(now instanceof Date ? new Date(now) : new Date());
  } finally {
    lock.releaseLock();
  }
}

function remind_(now) {
  const ss = SpreadsheetApp.getActive();
  const tz = ss.getSpreadsheetTimeZone();
  const day = (d) => { const p = Utilities.formatDate(d, tz, 'yyyy-MM-dd').split('-').map(Number); return Date.UTC(p[0], p[1] - 1, p[2]) / 864e5; };
  const show = (n) => { const d = new Date(n * 864e5); return MONTHS[d.getUTCMonth()] + ' ' + d.getUTCDate() + ', ' + d.getUTCFullYear(); };
  const iso = (n) => new Date(n * 864e5).toISOString().slice(0, 10);
  const weekday = (n) => { const w = new Date(n * 864e5).getUTCDay(); return w === 6 ? n - 1 : w === 0 ? n - 2 : n; };
  const plural = (n, w) => n + ' ' + w + (n === 1 ? '' : 's');

  const hires = tab_(ss, HIRES).getDataRange().getValues();
  const H = headers_(hires[0], ['Name', 'Start date', 'Manager email']);
  if (H['Name'] < 0 || H['Start date'] < 0) throw new Error('Missing column(s) on ' + HIRES + ': Name, Start date');
  const who = {};
  for (let i = 1; i < hires.length; i++) {
    const n = String(hires[i][H['Name']]).trim().toLowerCase();
    if (n) who[n] = { start: hires[i][H['Start date']], manager: H['Manager email'] >= 0 ? String(hires[i][H['Manager email']]).trim() : '' };
  }

  const sh = tab_(ss, CHECKLIST);
  const data = sh.getDataRange().getValues();
  const C = headers_(data[0], ['Hire', 'Task', 'Owner', 'Days from start', 'Done', 'Sent log']);
  const missing = Object.keys(C).filter((n) => C[n] < 0);
  if (missing.length) throw new Error('Missing column(s) on ' + CHECKLIST + ': ' + missing.join(', '));

  const me = Session.getEffectiveUser().getEmail();
  const today = day(now);
  const people = {}, problems = [];
  for (let r = 1; r < data.length; r++) {
    const row = data[r];
    const hire = String(row[C['Hire']]).trim(), task = String(row[C['Task']]).trim();
    if (!hire || !task) continue;
    if (row[C['Done']] === true || String(row[C['Done']]).trim().toLowerCase() === 'true') continue;
    const h = who[hire.toLowerCase()];
    if (!h) { problems.push('row ' + (r + 1) + ' (' + hire + ' is not on the ' + HIRES + ' tab)'); continue; }
    if (!(h.start instanceof Date)) { problems.push('row ' + (r + 1) + ' (' + hire + ' has no real Start date)'); continue; }
    const offset = String(row[C['Days from start']]).trim();
    if (offset === '' || Number(offset) % 1 !== 0) { problems.push('row ' + (r + 1) + ' (Days from start should be a whole number)'); continue; }
    const due = weekday(day(h.start) + Number(offset)), left = due - today, stamp = iso(due);
    let tag = '', note = '';
    if (left < 0) {
      tag = 'late' + Math.floor(-left / OVERDUE_EVERY);
      note = 'was due ' + show(due) + ' (' + plural(-left, 'day') + ' ago).';
    } else {
      const w = WINDOWS.filter((x) => left <= x).sort((a, b) => a - b)[0];
      if (w === undefined) continue;
      tag = 'd' + w;
      note = left === 0 ? 'is due TODAY, ' + show(due) + '.' : 'is due in ' + plural(left, 'day') + ', on ' + show(due) + '.';
    }
    const log = String(row[C['Sent log']]).split(';').map((s) => s.trim()).filter(String);
    if (log.indexOf(stamp + ' ' + tag) >= 0) continue;
    const owner = String(row[C['Owner']]).trim();
    const to = (owner.toLowerCase() === 'manager' ? h.manager : owner) || me;
    (people[to] = people[to] || []).push({ r: r, log: log, entry: stamp + ' ' + tag, due: due, hire: hire,
      text: hire + ' (start date ' + show(day(h.start)) + '): ' + task + ' ' + note });
  }

  let sent = 0, items = 0, stopped = '';
  for (const to of Object.keys(people)) {
    const list = people[to].sort((a, b) => a.due - b.due || (a.hire.toLowerCase() < b.hire.toLowerCase() ? -1 : a.hire.toLowerCase() > b.hire.toLowerCase() ? 1 : 0));
    const recipients = PREVIEW ? 1 : to.split(',').length;
    if (MailApp.getRemainingDailyQuota() < recipients) { stopped = 'quota'; break; }
    MailApp.sendEmail({
      to: PREVIEW ? me : to,
      subject: (PREVIEW ? '[PREVIEW to ' + to + '] ' : '') + 'Onboarding: ' + plural(list.length, 'task') + ' to do',
      body: list.map((x) => '- ' + x.text).join('\n') +
        '\n\nTick Done on the ' + CHECKLIST + ' tab when a task is finished, and its reminders stop.\n'
    });
    sent++; items += list.length;
    if (!PREVIEW) list.forEach((x) => sh.getRange(x.r + 1, C['Sent log'] + 1).setValue(x.log.concat([x.entry]).slice(-LOG_KEEP).join('; ')));
  }
  if (problems.length || stopped) console.log('Check rows: ' + problems.join(', ') + (stopped ? ' | stopped: daily email quota reached' : ''));
  return { sent: sent, items: items, problems: problems, stopped: stopped };
}

What it sends, with the defaults:

Step 5: what is due now, and how far along each hire is

On a tab named Summary, this lists every open task that is overdue, due today or due soon, the earliest first and ties by hire, using SORT, FILTER and REGEXMATCH:

=SORT(FILTER({Checklist!A2:A, Checklist!B2:B, Checklist!I2:I, Checklist!F2:F, Checklist!H2:H}, REGEXMATCH(Checklist!H2:H, "^(Overdue|Due today|Due soon)$")), 4, TRUE, 1, TRUE)
A
Hire
B
Task
C
Send to
D
Due
E
Status
Marcus LeeBenefits enrollment walkthroughhr@example.comNov 20, 2026Overdue
Marcus LeeOne-week check-insam@example.comNov 23, 2026Due today
Priya ShahOrder laptop and set up accountsit@example.comNov 24, 2026Due soon
Priya ShahCollect payroll and tax formshr@example.comNov 26, 2026Due soon

For progress, make a Progress tab. Put the first formula in A2 (it lists each hire once with UNIQUE), the next five in B2 to F2, and fill B2:F2 down a few rows past the last hire; they stay blank where A is blank. COUNTIF counts the hire’s tasks, COUNTIFS the ticked and overdue ones, and MINIFS finds the next open due date, wrapped in LET because MINIFS returns 0 when nothing is left. Format D as a percent and F as a date:

=UNIQUE(FILTER(Checklist!A2:A, Checklist!A2:A<>""))
=IF(A2="", "", COUNTIF(Checklist!$A$2:$A, A2))
=IF(A2="", "", COUNTIFS(Checklist!$A$2:$A, A2, Checklist!$E$2:$E, TRUE))
=IF(A2="", "", C2/B2)
=IF(A2="", "", COUNTIFS(Checklist!$A$2:$A, A2, Checklist!$H$2:$H, "Overdue"))
=IF(A2="", "", LET(d, MINIFS(Checklist!$F$2:$F, Checklist!$A$2:$A, A2, Checklist!$E$2:$E, FALSE), IF(d=0, "", d)))
A
Hire
B
Tasks
C
Done
D
% done
E
Overdue
F
Next open task due
Priya Shah600%0Nov 24, 2026
Marcus Lee6350%1Nov 20, 2026
Elena Ruiz6117%0Dec 9, 2026

Both tabs for the example on November 23, 2026. % done is shown rounded to whole percent.

Step 6: color the checklist

Select A2:J on the Checklist tab, open Format › Conditional formatting, choose Custom formula is and add these rules. They don’t overlap, so their order doesn’t matter:

RangeCustom formulaColorMeaning
A2:J=$H2="Overdue"RedPast its due date and not ticked
A2:J=$H2="Due today"OrangeDue today
A2:J=$H2="Due soon"YellowDue in 1 to 3 days
A2:J=$H2="Done"Grey text, strikethroughTicked Done

A filter view on the Hire column (Data › Filter views › Create new filter view) shows one person’s checklist without changing what everyone else sees.

Pitfalls

FAQ

How do I make an onboarding checklist in Google Sheets?

Keep the tasks once on a Template tab (task, owner and days from the start date, so -7 means a week before the first day), list new hires on a Hires tab, and give every hire a copy of the template on a Checklist tab with a Done checkbox. A due date formula looks up the hire’s start date and adds the days, so one template works for every hire.

How do I calculate due dates from a start date in Google Sheets?

Add the number of days to the start date. =IF(OR(A2="", D2=""), "", LET(s, XLOOKUP(A2, Hires!$A$2:$A, Hires!$C$2:$C, ""), IF(s="", "", WORKDAY(s+D2+1, -1)))) looks the start date up by the hire’s name, adds the offset in D2 and, through WORKDAY(… +1, -1), moves a date that lands on a Saturday or Sunday back to the Friday before.

Why not generate every hire’s checklist with one formula?

A formula that spills hires times tasks rebuilds its rows whenever a hire is added or sorted, but the Done checkboxes you tick are plain values that stay where they are, so they end up next to the wrong tasks. Copying the template into fixed rows (the script’s Onboarding menu does it in one click) keeps every tick with its task.

Can Google Sheets email the task owner when an onboarding task is due?

Not on its own; conditional formatting only colors cells. The Apps Script on this page runs on a daily trigger and sends each owner one email listing their open tasks due in 3 days or less, due today, or overdue (repeated every 3 days), and stops as soon as the task is ticked Done. An add-on such as SheetReminders does date reminders without code.

What if a new hire’s start date changes?

Change it once on the Hires tab. Every due date on that hire’s checklist is a formula on the start date, and the script works the dates out the same way, so the reminders move with it. Reminders are logged against the due date, so the new dates get their own reminders.

Who should the Manager owner be?

Write Manager in the template’s Owner column for tasks the hiring manager does, like the first-day welcome and check-ins. The Send to column and the script replace it with that hire’s Manager email from the Hires tab, so one template serves every team.

Want reminders without maintaining a script? SheetReminders (disclosure: we make it) is a Google Sheets add-on that watches a date column and emails the right person before it arrives. Point it at the Due column on the Checklist tab and the Send to column: several reminders per date (like 3 days before and on the day), personalized messages with {{Column name}} (so {{Hire}} and {{Task}} work) and {{Days left}}, a digest mode with one email per person listing everything due, skipping rows whose Status says Done (the Status formula says Done as soon as the box is ticked), and a sent log written back to the row. Building each hire’s checklist from the template stays with the menu in the script above. Sheet data stays inside your Google account and it uses narrow scopes. 14-day free trial, no credit card required. It is live on the Google Workspace Marketplace.
See SheetReminders
Short on time? Watch the 50-second version

Related Google Sheets guides

Instructions refer to Google Sheets and Apps Script as they worked on November 23, 2026. Not HR, legal or tax advice, and not affiliated with Google. Google Sheets is a trademark of Google LLC. Which forms, checks and deadlines apply to a new hire depends on where you are and what you do; check with your HR, payroll or legal adviser. Questions or corrections: hello@loomwise.app.